Tag Birmingham

Industrial LED Lighting Upgrade

Industrial machine shop where 400 W metal halide lamps were upgraded to high-output LED corn light retrofits, reducing energy consumption and maintenance.

Reducing energy consumption while improving working conditions is a priority for many manufacturing businesses. IGS Electrical was appointed to deliver a comprehensive LED lighting upgrade across multiple production, storage and dispatch areas within a large manufacturing facility, helping to reduce…

AHU Replacement Electrical Works

Air handling unit replacement project at a Birmingham hospital carried out by IGS Electrical.

Air handling units (AHUs) play a vital role in maintaining ventilation and environmental control within commercial and healthcare buildings. Replacing an existing unit requires careful planning to ensure both the electrical installation and associated control systems continue to operate reliably.…

Factory Electrical Installation Birmingham

Completed industrial electrical installation with distribution board and cable containment for a factory tool room relocation.

Factory Electrical Installation in Birmingham IGS Electrical recently completed a factory electrical installation in Birmingham after a manufacturer relocated their tool room into another building on site. The project involved installing a new three-phase distribution board, galvanised cable tray containment…